| Occidental of Elk Hills |
Installed in 2006. The scope includes control of six VAV AHU's, 40 VAV's with re-heat and control of the variable heating water system. The site also has an Administration Building with an Alerton IBEX system. We are currently negotiating the retrofit of that site. |

