| Fresno Yosemite International Airport |
Installed in 2008. This was the first project in a series of retrofits. The third retrofit is currently under way and the remaining un-retrofitted areas of the airport are in design. |
| Fresno Yosemite International Airport |
Installed in 2008. This was the first project in a series of retrofits. The third retrofit is currently under way and the remaining un-retrofitted areas of the airport are in design. |