| Madera Government Center |
Installed in 2005. The building is 4 stories and each floor has it's own dedicated rooftop VAV AHU. All communication to the rooftop units is achieved by BACnet/IP. Each AHU serves approximatley 50 re-heat VAV's. The heating water system is variable speed. |

