| San Joaquin Administration Building |
A primary / secondary, water cooled, chilled water plant with dual chillers, cooling towers and boilers for the VAV reheat coils. A LEED Gold Bldg. with advanced commissioning and measurement and verification of all electrical, water and gas usage in the building. Advanced PI programming maintains supply duct static pressure and temperature without the use of chilled water coil control valves.
|



